Skip to content
Collapse
? [[global:guest]]
Unread Recent
HOME SEARCH PROFILE MESSAGES 0 BOOKMARKS MEMBERS BADGES
Multitool.Org Forum
MultiTool.org • Community Header Space • Watch This Space

Warranty time

Scheduled Pinned Locked Moved Leatherman Tools
10 Posts 1 Posters 1.7k Views
  1. Home
  2. Tool Talk
  3. Leatherman Tools
  4. Warranty time
Warranty time
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • hank.rearden.7777019 Offline
    hank.rearden.7777019
    Posts: 11
    hank.rearden.7777019 Offline
    hank.rearden.7777019
    wrote on last edited by
    Quote Reply

      Anyone have an idea what turnaround time is for Letterman warranty service. I shipped off my wave two weeks ago. Im really jonesing for it back.

      1 Reply Last reply
      • SAK Guy Offline
        SAK Guy
        Posts: 23,929
        SAK Guy Offline
        SAK Guy
        wrote on last edited by
        #1 Quote Reply

          Mine was 2.5 months but according to posts I've read here and other places, that is non typical.

          • Robert

          Quo Fata Ferunt
          "It's sad that governments are chiefed by the double tongues." - Ten Bears

          Merit Badges
          Scale Changer OCD Squad Photographer EDCSource Buyer Fire Making Paracord Outdoor Cook Flashlight Stargazer ALOX Colors Level 3 EDC Pocket Dump Challenge Traditional Folder Challenge Mora User Titanium 111mm Collector Level 3 Birth Year SAK 130mm Collector Level 3 GEC Challenge
          1 Reply Last reply
          • detron Offline
            detron
            Posts: 7,546
            detron Offline
            detron
            wrote on last edited by
            #2 Quote Reply

              I think when I sent in a Surge a while back it took about 3 weeks, I have seen some that had a two week or less time.

              If I can help, let me know banner

              Merit Badges
              Hacker EDCSource Buyer Time Lord Level 3 Paracord MTO Tool Scaler User Hook User Scale Changer OCD Squad
              1 Reply Last reply
              • eddie1115 Offline
                eddie1115
                Posts: 1,760
                eddie1115 Offline
                eddie1115
                wrote on last edited by
                #3 Quote Reply

                  I sent a couple in last year, I think it was about 3 weeks as well.

                  Merit Badges
                  Camping Scaler User BO Tools Level 1 Flashlight Mod User ALOX Colors Level 1 Time Lord Level 2 ALOX with Scissors OCD Squad EDCSource Buyer LM Squirt Challenge Level 3 Hacker
                  1 Reply Last reply
                  • av8r1 Offline
                    av8r1
                    Posts: 391
                    av8r1 Offline
                    av8r1
                    wrote on last edited by
                    #4 Quote Reply

                      Two or three weeks is my experience, and I'm on the opposite coast.

                      My EDC:
                      Leatherman Skeletool Led Lenser P3 AFS P
                      Leatherman Style CS "Fauxton"
                      Sharpie Twin Tip Bic Mini

                      Merit Badges
                      Flashlight
                      1 Reply Last reply
                      • SteveC Online
                        SteveC
                        Global Moderators
                        Posts: 72,288
                        SteveC Online
                        SteveC
                        Global Moderators
                        wrote on last edited by
                        #5 Quote Reply

                          I mailed my Blast yesterday for warranty replacement of a worn out file. Hopefully two to three weeks. I think it depends on whether they fix or replace the tool. I sent in a Micra and had a brand new one a week later.

                          Merit Badges
                          Fishing Mod User Hacker Photographer Fire Making BO Tools Level 3 Discontinued SAK/MT Challenge Traditional Folder Challenge MTo Anniversary Challenge Victorinox Spirit Challenge MTO Rotation Challenge Calendar 2019 Calendar  2018 Calendar   2017 LM Surge Challenge Level 2 The SUPER Challenge GEC Challenge LM Crunch 15 day Challenge Chili Award PST 30 Day Challenge Buck User Calendar 2020 Buck 112 Ranger 30 Day Challenge 30 Blades 30 Days Mr Pinchy Love Bites 14th Anniversary Anything Goes Challenge Buck 110 Challenge LM Rebar Challenge The 30 Day MiniTool Challenge 30 Day Locks Up Challenge 20th Anniversary Anything Goes Challenge 30 Day Barlow Challenge
                          1 Reply Last reply
                          • sawman Offline
                            sawman
                            Posts: 9,745
                            sawman Offline
                            sawman
                            wrote on last edited by
                            #6 Quote Reply

                              I've sent back approximately a dozen LMs in the past and the avg turnaround is about 8-10 days back to me. Never experienced such great warranty with any other company :2tu:

                              SAW

                              1 Reply Last reply
                              • SteveC Online
                                SteveC
                                Global Moderators
                                Posts: 72,288
                                SteveC Online
                                SteveC
                                Global Moderators
                                wrote on last edited by
                                #7 Quote Reply

                                  Just got my Blast back today, 14 day turnaround for warranty repair.

                                  :tu: Leatherman

                                  Merit Badges
                                  Fishing Mod User Hacker Photographer Fire Making BO Tools Level 3 Discontinued SAK/MT Challenge Traditional Folder Challenge MTo Anniversary Challenge Victorinox Spirit Challenge MTO Rotation Challenge Calendar 2019 Calendar  2018 Calendar   2017 LM Surge Challenge Level 2 The SUPER Challenge GEC Challenge LM Crunch 15 day Challenge Chili Award PST 30 Day Challenge Buck User Calendar 2020 Buck 112 Ranger 30 Day Challenge 30 Blades 30 Days Mr Pinchy Love Bites 14th Anniversary Anything Goes Challenge Buck 110 Challenge LM Rebar Challenge The 30 Day MiniTool Challenge 30 Day Locks Up Challenge 20th Anniversary Anything Goes Challenge 30 Day Barlow Challenge
                                  1 Reply Last reply
                                  • Kampfer Offline
                                    Kampfer
                                    Posts: 7,287
                                    Kampfer Offline
                                    Kampfer
                                    wrote on last edited by
                                    #8 Quote Reply

                                      One week for replacing pliers head on my Sdieclip

                                      EDC: Black Talon, Black Cat, Spirit, LD02

                                      Merit Badges
                                      Photographer Hacker Mod User Airgun User Flashlight Gun User Duct Tape Reviewer LM Squirt Challenge Level 3 Off Brand MT Challenge Level 3
                                      1 Reply Last reply
                                      • NKlamerus Offline
                                        NKlamerus
                                        Posts: 4,767
                                        NKlamerus Offline
                                        NKlamerus
                                        wrote on last edited by
                                        #9 Quote Reply

                                          15 days here! Just recieved it back on Tuesday!

                                          Merit Badges
                                          LM Surge Challenge Level 3
                                          1 Reply Last reply

                                          Hello! It looks like you're interested in this conversation, but you don't have an account yet.

                                          Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.

                                          With your input, this post could be even better 💗

                                          Register Login

                                          1. Home
                                          2. Tool Talk
                                          3. Leatherman Tools
                                          4. Warranty time
                                          Reply
                                          • Reply as topic
                                          Log in to reply
                                          COMMUNITY LINKS
                                          EDC-TV SAKWiki GearFeed SAKSelector
                                          Operational Funds

                                          Help us keep the Unworkable working!

                                          Make A Donation
                                          November Goal: $300.00
                                          Due Date: Nov 30
                                          Total Receipts: $0.00
                                          Below Goal: $300.00
                                          0% funded
                                          • Login

                                          • Don't have an account? Register

                                          • Login or register to search.
                                          • First post
                                            Last post
                                          0