Skip to content
Collapse
? [[global:guest]]
Unread Recent
HOME SEARCH PROFILE NOTIFICATIONS 0 MESSAGES 0 BOOKMARKS MEMBERS BADGES
Multitool.Org Forum
MultiTool.org • Community Header Space • Watch This Space

The Commander (LM Super Charge Mod)

Scheduled Pinned Locked Moved The Mod Squad
121 Posts 1 Posters 99.9k Views
  1. Home
  2. Tool Talk
  3. The Mod Squad
  4. The Commander (LM Super Charge Mod)
The Commander (LM Super Charge Mod)
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • vadsoom Offline
    vadsoom
    Posts: 104
    vadsoom Offline
    vadsoom
    wrote on last edited by
    #110 Quote Reply

      Metro, PM sent. [emoji1]

      1 Reply Last reply
      • serialuser Offline
        serialuser
        Posts: 6
        serialuser Offline
        serialuser
        wrote on last edited by
        #111 Quote Reply

          Hi Eric!

          Sorry that I return this thread on the beginning (in some way), as beginner I need to clarify can I just swap pliers between xTi and Rebar without any additional modification to the pliers or the Charge body?

          Thanks!

          1 Reply Last reply
          • vadsoom Offline
            vadsoom
            Posts: 104
            vadsoom Offline
            vadsoom
            wrote on last edited by
            #112 Quote Reply

              You can do a direct swap, but the pliers won't fully close unless you remove part of the scissor thumb plate or grind a bit of the plier head by about 2mm.

              1 Reply Last reply
              • Toolslinger Offline
                Toolslinger
                Posts: 2,453
                Toolslinger Offline
                Toolslinger
                wrote on last edited by
                #113 Quote Reply

                  XTi doesn't have scissors. Plier head from a Rebar is drop in.

                  1 Reply Last reply
                  • serialuser Offline
                    serialuser
                    Posts: 6
                    serialuser Offline
                    serialuser
                    wrote on last edited by
                    #114 Quote Reply

                      @vadsoom said:
                      You can do a direct swap, but the pliers won't fully close unless you remove part of the scissor thumb plate or grind a bit of the plier head by about 2mm.

                      @Toolslinger said:
                      XTi doesn't have scissors. Plier head from a Rebar is drop in.

                      Guys thanks for the answers. My concern was about the locks of the knifes, the saw & the file when the pliers are in opened position. Look like it would be my first LM modification.

                      1 Reply Last reply
                      • Toolslinger Offline
                        Toolslinger
                        Posts: 2,453
                        Toolslinger Offline
                        Toolslinger
                        wrote on last edited by
                        #115 Quote Reply

                          @serialuser said:

                          @vadsoom said:

                          You can do a direct swap, but the pliers won't fully close unless you remove part of the scissor thumb plate or grind a bit of the plier head by about 2mm.

                          @Toolslinger said:
                          XTi doesn't have scissors. Plier head from a Rebar is drop in.

                          Guys thanks for the answers. My concern was about the locks of the knifes, the saw & the file when the pliers are in opened position. Look like it would be my first LM modification.

                          Won't be a problem on the XTi. The Rebar pliers seat properly and allow the blade locks to function normally.

                          1 Reply Last reply
                          • serialuser Offline
                            serialuser
                            Posts: 6
                            serialuser Offline
                            serialuser
                            wrote on last edited by
                            #116 Quote Reply

                              @Toolslinger said:

                              @serialuser said:

                              @vadsoom said:

                              You can do a direct swap, but the pliers won't fully close unless you remove part of the scissor thumb plate or grind a bit of the plier head by about 2mm.

                              @Toolslinger said:
                              XTi doesn't have scissors. Plier head from a Rebar is drop in.

                              Guys thanks for the answers. My concern was about the locks of the knifes, the saw & the file when the pliers are in opened position. Look like it would be my first LM modification.

                              Won't be a problem on the XTi. The Rebar pliers seat properly and allow the blade locks to function normally.

                              Thanks Toolslinger, that's the answer I was looking for.

                              1 Reply Last reply
                              • NicknameNMS Offline
                                NicknameNMS
                                Posts: 5
                                NicknameNMS Offline
                                NicknameNMS
                                wrote on last edited by
                                #117 Quote Reply

                                  Could we potentially get a link to some pictures? the original are long since gone

                                  1 Reply Last reply
                                  • NicknameNMS Offline
                                    NicknameNMS
                                    Posts: 5
                                    NicknameNMS Offline
                                    NicknameNMS
                                    wrote on last edited by
                                    #118 Quote Reply

                                      is there somewhere I can get your grip attachments you had on the commander and the wave? I am looking into ways to store extra tools like tweezers on the wave, and I do not want to use the keyring slot, I am also trying to figure out how to carry a second bit on it without a sheath

                                      1 Reply Last reply
                                      • tattoosteve99 Offline
                                        tattoosteve99
                                        Posts: 6,326
                                        tattoosteve99 Offline
                                        tattoosteve99
                                        wrote on last edited by
                                        #119 Quote Reply

                                          @NicknameNMS said:
                                          is there somewhere I can get your grip attachments you had on the commander and the wave? I am looking into ways to store extra tools like tweezers on the wave, and I do not want to use the keyring slot, I am also trying to figure out how to carry a second bit on it without a sheath

                                          This may help. This is metros stuff

                                          Link Preview Image
                                          Shapeways & Thangs Marketplace for 3D Creators - Shapeways Blog

                                          Discover the Thangs Marketplace powered by Shapeways — a new 3D printing platform where creators can sell, print, and share designs.

                                          favicon

                                          (www.shapeways.com)

                                          Also go to https://skinthsolutions.com/ as this is his site. Shoot him a message. He’s usually quick to respond. Hope that helps some.

                                          1 Reply Last reply
                                          • mbischa Offline
                                            mbischa
                                            Posts: 9
                                            mbischa Offline
                                            mbischa
                                            wrote on last edited by
                                            #120 Quote Reply

                                              Has the holders ever gone into production, are they available and from where?

                                              1 Reply Last reply

                                              Hello! It looks like you're interested in this conversation, but you don't have an account yet.

                                              Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.

                                              With your input, this post could be even better 💗

                                              Register Login

                                              • 1
                                              • 2
                                              • 3
                                              • 4
                                              • 5
                                              • 6
                                              • 7
                                              1. Home
                                              2. Tool Talk
                                              3. The Mod Squad
                                              4. The Commander (LM Super Charge Mod)
                                              Reply
                                              • Reply as topic
                                              Log in to reply
                                              COMMUNITY LINKS
                                              EDC-TV SAKWiki GearFeed SAKSelector
                                              Operational Funds

                                              Help us keep the Unworkable working!

                                              Make A Donation
                                              November Goal: $300.00
                                              Due Date: Nov 30
                                              Total Receipts: $0.00
                                              Below Goal: $300.00
                                              0% funded
                                              • Login

                                              • Don't have an account? Register

                                              • Login or register to search.
                                              • First post
                                                Last post
                                              0