Our Land Project
-
I just read this thread....this is epic!

-
Season 2 of the land project finally got started this weekend. Just my son and I went up as my wife was working. The swampy side of the land is very wet and home to many ducks at the moment. Beautiful weather though.
[attach id=0 msg=2337940]
[attach id=1 msg=2337940]
There are a few raised bedrock sections on the land and I decided to build a small cabin on one of them. I hauled and carried all the boards and tools to the clearing.
[attach id=2 msg=2337940]
[attach id=3 msg=2337940]




-
Here is the clearing I chose. Just some moss to scrape off but the rock is a solid base.
[attach id=1 msg=2337941]
Decorative fence project my wife made last fall.
[attach id=0 msg=2337941]
I could not pick up the 6x6 posts so had to drag them. It was more physical work than I had thought to get my tools and materials there but very satisfying to get started.
[attach id=2 msg=2337941]
I laid down some boards to eyeball the best site lines and got started.
[attach id=3 msg=2337941]




-
I had assumed I could use a normal drill and masonry bits to drill holes in the rock. NOPE! That barely marked the surface. I went into town and rented a hammer drill with 5/8" bit and that did the trick. Im using strong tie base plates and once bolted to bed rock they are very solid.
[attach id=0 msg=2337942]
[attach id=1 msg=2337942]
[attach id=2 msg=2337942]
[attach id=3 msg=2337942]




-
And... heres how far I got. 3 brackets bolted and one post secured. At least Im setup for good progress the next time I get up there as my tools and materials are right there.

[attach id=0 msg=2337943]
[attach id=1 msg=2337943]
[attach id=2 msg=2337943]
[attach id=3 msg=2337943]




-
Always a treat to tag along. I'm excited so I can only imagine how your are feeling. Thank you for the update.
-
-
Looking forward to seeing the progression of your build !

-
Wow Bob, I'm just catching this thread. What an awesome project mate.

-
Cool! Great idea to bolt into the rock.

-
-
Looking forward to seeing your posts. ::)
-
I came back up for more hammer swinging in the woods! I'm laminating the first beam in place. If I last until Monday I might get the foundation done.
It's nice and level and I need to cut the middle post for it next then do some string layout to figure out where to drill next.
Can an out of shape 49 yr old build a cabin buy himself? Stay tuned to find out!

By the way does anyone know the nailing schedule for beam making? I was putting 3x 16d nails every foot from both sides but it feels like alot.
[attach id=0 msg=2339379]

-
This is from the New Zealand standard I use. Of course we're upside-down here so you need to factor that in.



-
I'm guessing your bearers are 2/ 6x2"s, in which case the spacing would indeed be 6 x 2" = 12" max spacing and since the width is over 140mm (6" = 150mm) you need two rows. So two nails every foot, alternating sides according to our standard.
-
I always wondered what a 2x4 was in the metric system?
I got a second beam nailed up. Probably used too many nails but they're solid. It's 3 16ft 2x8 and ive hammered it of nails. It got dark so day one is done.
[attach id=0 msg=2339431]

-
@Syph007 said:
I always wondered what a 2x4 was in the metric system?Firstly, we say the largest size first, so a 2x4 we call 4x2, although that's more slang as we switched to decimal in the late 60's I think.
The metric equivalent of a 4x2 is 100x50mm, however the dressed size is actually 90x45mm.
-
Not a bad idea to use construction adhesive as well as nails for beams. Also I'm sure you are aware but crowns up is pretty important as well.
-
I made some more progress... but man did I underestimate how much more time it takes to build a project when you have to haul in all the supplies on foot and fight mosquitoes the whole time. :D
It took me forever to do the layout for the drill holes since the rock is uneven I had to run level boards and drop a plumb bob to mark the holes. I've got 2 more holes to drill, and 4 more posts to add, then I can put on the center beam and start on the floor framing. I did get the 2 outer beams perfectly parallel, square and level with each other so that was a hurdle completed at least. :D
[attach id=0 msg=2355861]
The other project I finished was getting my $600 3 wheeler running. It had a rusted gas tank so I brought that home and sealed it with tank seal paint and once I put that on with a new fuel filter it runs like a dream. This is my quick transportation between truck and build site.
[attach id=1 msg=2355861]
And the last job completed was a water tower. I cut and fitted all the boards at home then assembled the stand there and we lifted the 1000 litre tank on top. That was totally sketchy but we managed it. I hurt my back so my wife moved the stand into place.
[attach id=2 msg=2355861]
[attach id=3 msg=2355861]




Hello! It looks like you're interested in this conversation, but you don't have an account yet.
Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.
With your input, this post could be even better 💗
Register Login