March Break Project (Model Train Build)
-
I have a week to see how far I can get into building my N scale train diorama. I bought a Woodland Scenics "Scenic Ridge" kit and am now starting the build because I now have some free time. :D
So far, I have only managed to glue together the base boards and the subterranean track underlay. The tracks will fit over these foam pieces...allowing me to make valleys lower then the tracks. This whole thing will be 3'x6'. My next task will be to fit foam bridges over the underpass, and then to start plaster cloth covering the inside of the tunnel. I am going to be taking my time on this project which has been in the planning stage for well over 4 months now. That is about how long it has taken me to accrue the buildings, vehicles, and people.
Time for a few photographs.
Here you can see part of the underlay glued and ready to go. The tacks and track bed will go on top of the underlay.

Here are my villagers. I have around 100 of them now...and they are awfully small at N scale.

I had to have a place to store these items, so I have a temporary table set up in the living room. The houses are mostly N scale Tomytec buildings with a few extras added here and there. This layout won't match the final layout.

I think I will update this thread as I go.

-
Ooooohhh nice!!!

This is going to be a very cool project.
-
I hope so. Can't wait to get into the real fun stuff which is the finishing of the landscape...but I am so far away from that right now.
Incidentally, even though I thought I had everything, I am off later today to get a list of supporting items I will need to continue with some of the later steps.
I am also waiting on two special items that will finish off the build once I get there. I won a DCC sound enabled Diesel engine off of eBay late last week, and I bought a Bachmann Dynamis DCC controller that will enable all the sound features of the train engine.
-
so jealous of march break... we haven't got a break until easter... :ahhh
-
looks good
-
what's the best bit of this hobby for you chako?
-
This is just one of many hobbies I am involved in. However, it has been a very long ambition of mine to make a diorama for a train set. When I was a kid, I had a train set that my father bought me. I was too young, and I strongly suspect he bought it for himself more than anything else. He mounted it on a piece of plywood and that was that. This bucket list project combines my long abiding fascination with miniatures, model making, and trains into one piece.
So what is the best bit of this hobby for me? Just having fun would have to be it. :D
-
I just finished plaster cloth coating the inside of the mountain, and am waiting for that to dry. The next step is to glue the track bed, track, and ballast down. Guess these areas will be very hard to reach later on. :D
I took these about half way done.


-
What exactly do you mean by "diorama?" Are you thinking about a fixed or portable operating display of some sort? :)
When I was younger, I always wanted to do a glass-topped coffee table layout.

-
Fixed upstairs on a portable folding table which now resides temporarily in my living room. I reckon it will be light and easily transported once done...but at 3'x6', not exactly portable.
-
My son absolutely loves the old live action Thomas the Train shows, and it has got me thinking about building a set like that for him for later on.
I really just wanted to subscribe to this thread because it looks like it's gonna be awesome! Thanks Chako for always documenting your adventures so well!
-
Not sure if it will be awesome. I am certain it will be a learning experience for me however, as this is my first time building something like this.
Anyways, I came across a dilemma last night. I realized I had to build the complete track to see where I stood. You see, the instructions tell me to build the track section inside the tunnels. I thought I could get away with just following the instructions...but alas, you cannot trust everything you read. I had bought the Atlas track pack made specifically for this layout. I found out the instructions and the track pieces deviated from what the Kit instructions stated from Woodland Scenics. I figured ok...no problems. Well, this morning I got cold feet and decided to bite the bullet and just build the whole track to see if all is as it should be. Good thing I spent an hour and a half building the track. I found that both instructions were wrong. I switched a few track pieced around and it now fits a lot better now.
On a flip side, Atlas tracks come with the metal connector pieces connected in strips of 4. This means you have to move them side to side to cause metal fatigue which eventually breaks them apart. If I see another Atlas track connector anytime soon, I shall scream.
On a positive note, I now have one of my steam Bachmann train engines running and testing the track. I had to remove a few pieced of track to jury rig a Bachmann EZ track with power connector to power the rails. Everything seems to run fine. Now I have to break it all apart and continue building that track tunnel inside and walls. That is my job for today. Not sure if I will get it done in the time frame I have allotted myself...but that is my goal.
Here are some photos.
Yes, I have used my motorcycle kit Leatherman MUT in the build. I have found the saw and knife blade to be useful.

And here is the whole track layout...well as much as I could get into the plane of view. I stopped the train just in case you were wondering.

-
take another pic with the fish eye ;)
-
This is very cool and you are such a big kid! :D
-
<--- Trying very hard at not growing up anymore then I have to. :D

Anyhow, its update time.
Not much progress I fear. Everything is taking a little longer than anticipated, especially foam tack glue drying time. But just to show you that there is some progress here are a couple more photographs.
Well I now have the internal tunnel walls complete along with the foam tunnel portals glued in place. Here, you can see the foam portals, and one of the plaster detailed pieces that still needs to be coloured and glued into place...but that will be much later.

The next step is to start putting on the edge boards. That big back piece consists of 5 boards. I still need to cut an inch off of the right most piece. The back boards aren't glued in place yet. After I dry fit them as in the photo, I get to make the sides and front board profiles as well. After those have been cut and dry fitted in place, I have to cut paper profiles and then trace them onto those boards and cut them to shape. Once that is done, I get to make the tunnel ceilings and then the real fun part of making newspaper wads which will then get plaster cloth coated to make the mountains. This is taking quite some time to do...and I must admit, I am getting my money's worth of fun out of doing this.

-
i hope you hand carved the tunnel portals ;) looking good
-
No. They come pre-made. It would take me forever to do that sort of detail.
Update time.
I just finished installing the edge boards. I started off by fitting them in place. Then I cut out the paper templates last night while watching TV. This morning, I glued the edge boards together and then to the base. I then placed my paper templates onto the walls, and traced them using a pencil. The next step was to use my new fancy wire foam cutter. This was money well spent. It heats a nichrome wire which goes through the foam like it does not exist. I used this foam wire cutter to make my profile. Afterwards, I used an Exacto knife with a long blade to cut out the access ports in the back (The Leatherman MUT's saw does make a mess of Styrofoam). These will allow access to the track inside to fix any problems that might happen inside the mountain.
My next step after all of this is to make foam tunnel ceilings...and then the fun part of newspaper bundles and then plaster cloth over that to make the mountain.
Here are the photos.
The edge boards are now glued to each other and the base.

Next is to trace the paper template.

Is it wrong that I love my hot wire foam cutter so much? The tool made a tough job supper easy. Here you can see that I have finished using it, and have cut out two of the 3 tunnel access portals.

Onto the next step I guess...but I need a little break.

-
Wow, I didn't know there were going to be such large mountains! :) Looks like you're well on your way to an N-scale Gorre and Daphetid

-
Tell me about it. I was a little surprised at how high that corner mountain will be.
Well, looks like my next step might be to paint some burnt umber in the visible parts of those tunnels. I still haven't placed ballast in those locations yet either. I think it might be wise to eliminate as much of that white right now while I can.
-
That is going to be awesome.
Godd work Chako!
Hello! It looks like you're interested in this conversation, but you don't have an account yet.
Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.
With your input, this post could be even better 💗